Contacts

Municipal Office

395 Mulock Drive P.O. Box 328 Station Main, Newmarket, Ontario
L3Y 4X7
905-895-5193

Email Us

​​​​​​​​​​​​​​​ View all News and Notices 

  • Join us for a Playground Improvement Public Information Centre (PIC)

    Created: Friday, March 10, 2023

    Residents in Wards 1, 2 & 6 are invited to stop by the Playground Improvement Public Information Centre (PIC) for the opportunity to review draft playground drawings and see what we have planned for your neighbourhood park!  

    Date: Wednesday, March 29 from 6 to 8 p.m.  
    Location: Town of Newmarket Municipal Offices (395 Mulock Drive)  


    The following parks will be updated during the summer 2023 as part of our commitment to provide our residents with beautiful, enjoyable, accessible and safe parklands. Residents can provide theirs feedback on the types of play structures such as swing types and more! 

    • Arnhem Park (Rourke Place /Bondi Avenue)  
      • New 911 park address signs to be installed  
      • New playground structure to be installed 
      • Playground surfacing to be changed to engineered wood fibre for accessibility needs

    • Frank Williams Park (Poppy Lane / Wilbur Phipher Circle)  
      • New playground structures to be installed  
      • New swing set to be installed  
      • Playground surfacing to be changed to engineered wood fibre for accessibility needs 
      • Repair to interlocking  
      • New picnic table pad by shade cover  
    •  John Georgas Park (Allan Ave. / Perrin Ave.) 
      • New 911 park address signs to be installed  
      • New playground structure to be installed 
      • Playground surfacing to be changed to engineered wood fibre for accessibility needs 
    • Clare Salisbury North (Clearmeadow Blvd. / Denise Circle)  
      • New playground structure to be installed 
      • New swing set to be installed  
      • Playground surfacing to be changed to engineered wood fibre for accessibility needs 

    Newmarket staff will be available to answer any inquires and/or concerns you may have.  

    Can’t make it? Playground drawings will be uploaded online after March 29 for you to provide feedback. Please provide feedback to [email protected] or use the feedback tab on heynewmarket.ca/playgrounds